SCHWING Concrete Pump Pipe/ ST52 Concrete Pump Pipe
THE SPECIFICATIONS OF CONCRETE PUMP PIPE:
Production technique comparison
Traditional manual welding
Our automatic welding
THE PRODUCTIVE PROCESS OF CONCRETE PUMP PIPE:
Packaging |
1. Packing in plastic bag and caps, 10 pcs per buckle or in iron frame. |
2. According to customer’s requirement |
|
Delivery Time |
1. Stock size 1-3 working days. |
2. Custom size 10-15 working days. |


Send Inquiry to This Supplier
You May Also Like
-
Wear-resistant DN125 Concrete Pump Pipe With Flange Coupling for High-pressure Concrete DeliveryNegotiableMOQ: 50 Pieces
-
Excavator Hydraulic Grapple With Pointed Claw Tips and Welded Frame for HandlingUS$ 1000 - 1500MOQ: 1 Piece
-
Engineering & Construction Machinery PartsNegotiableMOQ: 2500 Sets
-
Filter Element 4120000723001 for SDLG Wheel Loader Genuine OEMNegotiableMOQ: 1 Piece
-
Excavator Foot Valve E312 E320 E320B PartsNegotiableMOQ: 1 Blade
-
Chromium Carbide Overlay Wear Plate Excavator Crusher Bucket LinerUS$ 399.69 - 399.69MOQ: 1 Square Meter
-
Original Sany LD700RC Rock Chisel Bucket Tooth for Sany Excavator Spare Parts.US$ 6MOQ: 1 Unit
-
Water Excavator Sensor Replacement for Wiring Service YNF18013NegotiableMOQ: 1 Piece
-
Excavator Piston Pump PC05-6 PC20 PC30 PC200-6 PC200-7 PC220 PC240 PC400 PC450 High Pressure Hydraulic Pump for KomatsuNegotiableMOQ: 1 Combo
-
Connector Sealing up Pipe Stop Water Hexagon Threaded Protection Hard PlugsNegotiableMOQ: 100 Pieces






