High Quality Stainless Steel End Cap, Cap, Weld Cap
Factory
Workshop
Our Workshop
Warehouse
Our Warehouse
Raw materials
Our materials
Packing Details : Plywood case with inside plastic bag, or as per customer's requirement.
Delivery Details : 15-60days, depands on quantity.
Q: Are you trading company or manufacturer ?
A: We are manufacturer
Q: How long is your delivery time?
A: Generally it is 7-15 days if the goods are in stock. or it is 15-30 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge, but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below:
We could manufacture according to customer's requirement.
Sample would be free, if customer pay the freight cost.
Send Inquiry to This Supplier
You May Also Like
-
ASTM A106 Grade B Seamless Carbon Steel Pipe | ASME B36.10M | High-Quality Chinese SupplierUS$ 0.45 - 0.55MOQ: 100 Kilograms
-
Structural FRP Round Tube Used for Cooling Tower, Lightweight, Anti-Corrosion, 2m LengthNegotiableMOQ: 300 Cubic Meters
-
304 / 316L Stainless Steel Instrumentation Tube; Cold-Drawn – 1/8" – 1" OD – 0.5mm – 2.0mm – CoiledUS$ 500 - 560MOQ: 30 Tons
-
Carbon Steel Pipe ASTM A106 Gr.B 1/2" Sch160 Cold Drawn Seamless TubeNegotiableMOQ: 1 Ton
-
Q235b Mild Steel Square Hollow Section Ms Box Section ERW Technique for Structure Pipe Use-Bending Welding Services AvailableNegotiableMOQ: 1 Ton
-
ASME SA335 Seamless Ferritic Alloy Steel Pipe for High Temperature ServiceNegotiableMOQ: 1 Metric Ton
-
Steel Pipe & TubeNegotiableMOQ: 2300 Tons
-
Factory Price Carbon Seamless PipeUS$ 525 - 545MOQ: 10 Metric Tons
-
Hot Dipped Galvanized Round Iron PipeUS$ 500 - 550MOQ: 10 Tons
-
SO2531 EN598 Ductile Cast Iron Pipe, DN100~DN1200 Underground Water Pipe Factory SupplyNegotiableMOQ: 1 Ton
















