Kelly Bar Fixed Frame Guide
Kelly bar guide frame, kelly bar fixed guide frame
Kelly bar guide frame is a connection part from the kelly bar to drilling rig, help fixed kelly bar when it drilling depth. We supply kelly guide frame for Bauer,Sany, MAIT,IMT,XCMG,ZOOMLION, SOILMEC, Liebherr etc.
Drilling rig kelly bar & spare parts
we supply all accessories for rotary drilling rigs, like swivel joint, damper spring, motor, speed gearbox,damperbber, base parts, like track roller, guide roller, gear ring, pulley etc.,
We have been supply one-stop service for rotary drilling rig since 2004 year, which specialize in producing kelly bar & spare parts, exported used drilling rigs, reapir & maintenanace.
We have been granted 10 patents by State Intellectual Property Office of P.R.China. For example, one of patents No.ZL2012 2 0161611L0, which is used for a multi locking type kelly bar. It's adapt to complicated geological condition and we get good feedback from Bauer, IMT, Soilmec, Mait, Liebherr, XCMG, SANY, Lovol, Yutong, Sunward, etc.
By the way, about kelly bar, We welcome any trusted foreign dealer cooperation in your local place.

High quality aluminum sheet wrapped kelly bar , wooden case for small accessories. The nearest port will be Tianjin port and Beijing airport, both ports are about one hour distance from factory.
YOU ARE MAKING SMART CHOICE
a) . Material & Technical---35CrMo / 27 SiMn / Q234B high alloy seamless steel pipe under quenched-tempered heat treament.
b) . Gold supplier on Alibaba with TRADE ASSURANCE to promise quality and delievery.
c) . Professional experienced R&D department, strictly QA&QC development.
d) . Feedback within 24 hours from professional consultors.
e) . Higher hardness, higher flexibility,excellent welding technology.
f ) . Thinner tube, smaller inter-tube distance, good abrasion resistance.
g) . Advanced technology of 6-key design, standard modular design.
1. Q: What's Material & Technology of Kelly bar?
A: 35CrMo / 27 SiMn / Q345B hIgh alloy seamless steel pipe under quenched-tempered heat treament.
2. Q: What's your delievery time of kelly bar?
A: Within 10 working days after confirmed deposit.
3. Q: What's your guarantee period of kelly bar?
A: 180 days under normal operation.
4. Q: What's your payment terms?
A: 30% T/T as advanced deposit,70% balance before shipment.
5. Q: Where your factory location?
A: Beijing in China, We welcome any visit and distributor cooperaton.
Send Inquiry to This Supplier
You May Also Like
-
Pressure Sensor 803594130 for XCMG Excavator Hydraulic System Genuine OEMUS$ 1MOQ: 1 Unit
-
Original Sany LD700RC Rock Chisel Bucket Tooth for Sany Excavator Spare Parts.US$ 6MOQ: 1 Unit
-
Factory Direct Sweeper With Side Brush OEM Custom Hopper Size Gutter Broom Hydraulic Drive Manufacturer SupplierUS$ 1000 - 2000MOQ: 1 Piece
-
In Stock MTU Engine Parts Exhaust Turbocharger 0020203900NegotiableMOQ: 1 Barrel
-
High-Performance GT2263KLNV Turbo Charger for Hino Engineering/commercial VehiclesUS$ 540 - 560MOQ: 1 Unit
-
Engineering & Construction Machinery PartsNegotiableMOQ: 2500 Sets
-
Chromium Carbide Overlay Wear Plate Excavator Crusher Bucket LinerUS$ 399.69 - 399.69MOQ: 1 Square Meter
-
Water Excavator Sensor Replacement for Wiring Service YNF18013NegotiableMOQ: 1 Piece
-
Excavator Piston Pump PC05-6 PC20 PC30 PC200-6 PC200-7 PC220 PC240 PC400 PC450 High Pressure Hydraulic Pump for KomatsuNegotiableMOQ: 1 Combo
-
Connector Sealing up Pipe Stop Water Hexagon Threaded Protection Hard PlugsNegotiableMOQ: 100 Pieces









