Quick-setting Type Water Will Not Leak Waterproof Products Wholesale

1, save material: material is easy to be affected with damp be affected with damp be affected with damp be affected with damp be affected with damp be affected with damp be affected with damp be affected with damp, should be sealed in a dry place, shelf life is 6 months.
2, the construction environment: the sun, it is necessary to strengthen the moisture curing; - 5 ℃ below, you need to add 1-3% of sodium nitrite powder weight.
Surface treatment:
1, the surface of the water seepage
Foundation must be fully wet saturated (suction) no longer need a clean, firm, smooth, but not too smooth.
2. Leak place
Chisel or percussion drill in oblique mouth leaky place also certain depth (about 3-4 cm), outside the tank, big or small hole cut hole in as little as possible, and then rinse clean.
Water will not leak material preparation:
Scraping material powder: water = 0.3 + 0.35. Stir 3 to 5 minutes (the best blender) into a homogeneous putty, rule out difficult cloth material powder. Sealing material powder: water = 1-0. 25 friction ChengLiao regiment. Quickly set up in order to ensure that materials, when the environmental temperature under 10 ℃, 50 ℃ warm water in the sauce.
Available time and coagulation time:
Quick setup type water won't leak time for 3 minutes, do not add water use after initial setting. The coagulation time, about 5 minutes. Water, low temperature, more available time and coagulation time is long, short.
Water will not leak operation:
1, the surface of the water penetration:
Material before use dry cloth rapid drying and feeding base.
(1) using floating in the first layer of the material, if there is leakage first, don't worry about it.
(2) after hardening coating (hand pressure not fingerprint), water spray wet water can be (but).
(3) the scraper or floating on the second floor.
(4) if there is still a local seepage of water, in the barrier layer material, until don't leak.
When the fed is a little hard, back and forth a few times, to make it more compact, at the same time pay attention to the knee. The dose of each layer of about 1 kg , the total about 2 kg .
2, slack mouth:
According to the shape of the hole will leak to slightly less than the size of the cutting material, take a few minutes (with hand knead have hard feeling advisable), using extrusion rods, crowded round solid, light can quickly check leakage, then in about 10 cm cut on the outside and a layer of material. Jam might leak before the best good waterproof processing, such as waterproof plugging after difficulty, or may come from the surrounding water.
Moist and maintenance:
Immediately after quenching on wet curing coating, prevent breakage mode of maintenance: water spray, such as moisture content, curing coating liquid, maintenance should be carefully, to avoid damaging the coating for the first time, a total of treatment 2-3 days, the water can be natural curing (basement water seepage, etc.).
Matters needing attention
But if the bedding face construction waterproof layer after water, must be the moisture condensation, dry day will disappear
Send Inquiry to This Supplier
You May Also Like
-
Water Resistant Breathable Membranes 1m X 50m 100 GSMUS$ 0.3MOQ: 2000 Square Meters
-
Asphalt Waterproof MembraneNegotiableMOQ: 2400 Rolls
-
Polymer Cement Based Waterproofing CoatingUS$ 1,900 - 3,000MOQ: 1 Ton
-
Artificial Marble for Room Covered High Glossy Water and Fire ProofUS$ 3 - 8MOQ: 300 Square Meters
-
Waterproof Pad for BabyUS$ 2 - 7MOQ: 3000 Packs
-
GCL Sodium Bentonite Waterproof BlanketUS$ 1 - 2MOQ: 3000 Square Meters
-
Foshan Shunde Lecong Furniture Market Business Visiting Assistant Traveling Service Sourcing Purchasing Delivery AgentUS$ 1 - 1,000MOQ: 1 Case
-
PET/PP Needle Punched Nonwoven Geotextile 100gsmUS$ 0.1 - 0.6MOQ: 40 Rolls
-
Water Vapour BarrierUS$ 0.5 - 0.99MOQ: 5000 Square Meters
-
Additives----Silane Based Hydrophobic AgentUS$ 5.8 - 6.1MOQ: 1000 Kilograms