Scaffolding Sleeve Coupler
Used Scaffolding For Sale |
|
1.Manufacturer |
Nanjing XY Metal Material Co.,Ltd |
2.History |
Set up in 2010 |
3.Product name |
Drop forged scaffolding coupler |
4.Surface treatment |
Pre-Galvanized , Hot Galvanized |
5.Technology |
drop forged |
6.Size |
48.3x48.3mm |
7.MOQ |
5000pcs |
8.Supply ability |
300000pcs per month |
9.Packing |
packed bags with steel pallet or wooden pallet, arccording to request of client |
10.Delivery time |
as the quantity in order.20-30days |
11.Payment term |
LC or 30% deposit prepaid after confirmed PI, the balance against copy of BL before cargo arrival |
12.Main products |
Coupler : |
|
British Drop Forged Double Coupler 48.3x48.3mm 0.98kg 1.00kg. 1.05kg |
|
British Drop Forged Swivel Coupler 48.3x48.3mm 1.12kg, 1.15kg |
|
Girder Coupler 48.3mm 1.5kg |
|
Putlog Coupler 48.3mm 0.65kg |
|
Germany Drop Forged Double Coupler 48.3x48.3mm 1.45kg |
|
Germany Drop Forged Swivel Coupler 48.3x48.3nn 1.78kg |
1.Product name |
Pressed scaffolding clamp |
4.Surface treatment |
Pre-Galvanized |
5.Technology |
Pressed |
6.Size |
48.3x48.3mm , 48.6x48.6mm |
7.MOQ |
5000pcs |
8.Supply ability |
300000pcs per month |
9.Packing |
packed bags with steel pallet or wooden pallet, arccording to request of client |
10.Delivery time |
as the quantity in order.20-30days |
11.Payment term |
LC or 30% deposit prepaid after confirmed PI, the balance against copy of BL before cargo arrival |
12.Main products |
Coupler : |
|
British Pressed Double coupler 48.3x48.3mm 0.85kg |
|
British Pressed Swivel Coupler 48.3x48.3mm 1.05kg |
|
JIS standard Fixed clamp 48.6mm 0.75kg |
|
JIS standard adjustable clamp 48.6mm 0.75kg |
|
Pressed Girder Clamp 48.3mm 1.45kg |
|
Ladder/board Clamp 48.3mm 0.63kg |
1. We Nanjing XY scaffolding production Co.,Ltd has 10 years manufacture experience in this field.
2. Our scaffolding product must be up to export standard after do testing
3. Much feedback from our client that our product quality is stable , durable.
4. We promise long term after- sale service for every client.
1.Why we choose your company?
Answer:All our service will be on the benifit of the clients,don"t worried anything ,all we do it.
2.Are you manufacturer or trading company ?
Answer: Manufacturer ,factory located in NO192 Dingjia shan RD. Dachang street, Luhe district, Nanjing.
Send Inquiry to This Supplier
You May Also Like
-
ScaffoldingNegotiableMOQ: 2700 Sets
-
2mm Thick Q235B Perforated Steel Decking for Disc-Buckle Shoring, Hot Dip Galvanized, Load 500kgNegotiableMOQ: 1 Piece
-
48.3mm Yellow Scaffold Fitting Tube Pole Top Bolt Caps Scaffolding End CapUS$ 0.04 - 0.08MOQ: 1 Piece
-
China Wholesale Top Selling Products 2015 Scaffolding Plastic Screw End CapsUS$ 0.02 - 0.02MOQ: 10000 Pieces
-
Stainless Steel Knuckle Joint PinUS$ 3 - 5MOQ: 1000 Pieces
-
High Quality Scaffolding System Accessories Scaffolding Steel PlankUS$ 8 - 12MOQ: 1000 Pieces
-
Non Sparking Safety Hand Tools Parallel Vice HardwareUS$ 629.93 - 2,050.18MOQ: 1 Unit
-
China Honglu Structure Steel TrestleUS$ 1,300 - 1,400MOQ: 22 Tons
-
Zinc Plated Forged Antiluce Drop Lock PinUS$ 0.2 - 0.3MOQ: 1000 Pieces
-
Swivel or Double Scaffold Quick CouplerUS$ 0.4 - 4MOQ: 1000 Pieces






