Home > Construction & Decoration > Waterproof Building Materials > Asphalt Waterproof Membrane > Aluminum Injection Packer for Waterproof Grouting Pump

Aluminum Injection Packer for Waterproof Grouting Pump

Aluminum Injection Packer for Waterproof Grouting Pump photo-1
Aluminum Injection Packer for Waterproof Grouting Pump photo-2
Aluminum Injection Packer for Waterproof Grouting Pump photo-3
Aluminum Injection Packer for Waterproof Grouting Pump photo-4
Aluminum Injection Packer for Waterproof Grouting Pump photo-5
Aluminum Injection Packer for Waterproof Grouting Pump photo-6
US$ 0.1 - 0.2 MOQ: 1000 Pieces
Key Specifications
Get Latest Price
Place of Origin:
Shanghai, China
Brand Name:
Ruth Aluminum Injection Packer
Model Number:
10*80mm
Payment & Shipping
Payment Methods:
Port of Shipment:
Shanghai
Delivery Detail:
Delivery time depends on order quantity.
Place of Origin Shanghai, China
Brand Name Ruth Aluminum Injection Packer
Model Number 10*80mm

Aluminum injection packer for Waterproof grouting pump

Product Description

 

Ruth injection packer for injection machine spare parts is used with the Ruth injection machine in concrete crack repair and water leaking stop. It suits for both polyurethane and epoxy injection.

 

Packaging & Shipping

  ploy bag packing,50pcs/bag,then 20bags/carton or according to your request.

  Aluminum injection packer for Waterproof grouting pump 

Our Services

 1  We have enough safety  stock for the normal sizes of our injection packers. 

     Fast response are available.

 

2  For Customized sizes, usually require within 5 days to produce

 

3   We always supply high quality and stable products. ( the defect rate is controled within 3 pcs in 1000pcs

 

 

FAQ

 

What’s your MOQ?

 If by sea and by air

Normally, for grout injection packer,the MOQ is 10000pcs. 

 

The quantity less than MOQ,  it will deliver by speed express

 

What’s your price term and payment term?

 

We support for EXW, FOB, CIF,CNF etc 

Payment term : 30% deposit by T/T ,and 70% balance upon scan of copy B/L.

 

What’s your delivery time?

 

The delivery time is within 3 to 7 days upon receive your  down payment

 

 

Brief Working procedure for High pressure packer for waterproof plugging.

 

Aluminum injection packer for Waterproof grouting pump

 

 

 1. Clean the stains & mark the position of cracks

 

2. Drill holes along side the cracks in 45degree angle every 20cm, the depth of the holes must be more than 1/2 depths of the concrete.

 

3. Inject the material to the holes until the material run out from the cracks and holes.

 

4. Remove the extravasations after the material solidify

.

 

Send Inquiry to This Supplier

* Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Trading Company
Year Established
2001
Factory Size
Below 1,000 square meters
Total Employees
101 - 200 People

Recommended Categories

Explore top categories and find suppliers for your specific needs