Home > Construction & Decoration > Prefabricated Building > Steel Structure Building > Frame Metal Shed Steel Structure Factory Building

Frame Metal Shed Steel Structure Factory Building

Frame Metal Shed Steel Structure Factory Building photo-1
Frame Metal Shed Steel Structure Factory Building photo-2
Frame Metal Shed Steel Structure Factory Building photo-3
Frame Metal Shed Steel Structure Factory Building photo-4
Frame Metal Shed Steel Structure Factory Building photo-5
Frame Metal Shed Steel Structure Factory Building photo-6
US$ 20 - 100 MOQ: 500 Square Meters
Key Specifications
Get Latest Price
Standard:
AISI, ASTM, BS, DIN, GB, JIS
Grade:
Q235 Q345B
Dimensions:
Customers' Requirement
Payment & Shipping
Payment Methods:
Port of Shipment:
Qingdao port China
Delivery Detail:
Delivery time depends on order quantity.
Standard AISI, ASTM, BS, DIN, GB, JIS
Grade Q235 Q345B
Dimensions Customers' Requirement
Place of Origin Shandong, China
Brand Name DFX
Model Number Frame Metal Shed Steel Structure Factory Building
Type Light
Application Steel Workshop

Frame Metal Shed Steel Structure Factory Building

Product Description

    Metal Structure Building is a new type of light steel structure building system formed from a main steel framework comprised of H section,Z section and U section steel components,the roof and walls utilizing a variety of panels and other components such as windows,doors,and cranes.The light steel structure building is widely used in the construction of buildings such as warehouses,workshops,large factories,poultry feeding buildings,hangar,ect. 

Advantages of light steel structure:
1) Cost saving and transportation convenient, custom design available.
2) The main beam and column are made of quality steel.
3) Steel structure makes the house resist heavy wind of 140km/h and 8-grade earthquake.
4) Easy assembly and disassembly several times without damage.
5) Widely used in construction site, office building, dormitory etc.
6) Good environmental protection effect. Steel structure housing construction greatly reduces sand, stone and dosage of the ash. Most of the used materials are recyclable or degradable, little rubbish produced.

 

Workshop

Frame Metal Shed Steel Structure Factory Building 

Building Main Part

1. Base: Concrete and steel foundation bolts.

2. Column and beam: material Q345(S355JR)or Q235(S235JR) steel, all bolts connection ,straight cross-section or Variable cross-section.

3. Surfrace: Paint or hot dip galvanized.

4. Galvanized C or Z purlin,size from C100~C320,Z160~Z300.

Frame Metal Shed Steel Structure Factory Building

5. Bracing: X or V or other type bracing made from angle , round pipe etc.

Frame Metal Shed Steel Structure Factory Building

 

6. Roof and Wall Panel:

(a) Single colorful corrugated steel sheet --Thickness:0.12-1.2mm; Width: 310-1150mm, etc.

(b) Sandwich panel with EPS, rock wool, glass wool , PU etc.-- Thickness around 50mm~150mm;Width 970mm or 950mm.

 Frame Metal Shed Steel Structure Factory Building

 

 

7. Accessories: semi-transparent skylight belts, Ventilators, down pipe, out gutter etc.Frame Metal Shed Steel Structure Factory Building

 

Frame Metal Shed Steel Structure Factory Building

 

Packaging & Shipping

 

Frame Metal Shed Steel Structure Factory Building 

Drawings & Quotation:

1) Customized design is welcomed.As long as you like, we can design and provide drawings for you.
2) In order to give you an exactly quotation and drawings, please let us know the blow information:

  1. Dimension: Length, width, height, eave height, roof pitch, etc.

  2. Doors and windows: Dimension, quantity, position to put them.

  3. Local climate: Wind speed, snow load, floor load etc.

  4. Wall and roof material: Sandwich panel or steel sheet.

  5. Crane beam: Do you need crane beam inside the steel structure? And its capacity.

  6. Other requirements.

Frame Metal Shed Steel Structure Factory Building

 

 

 

 

 

Send Inquiry to This Supplier

* Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Manufacturer, Trading Company
Year Established
2011
Factory Size
50,000-100,000 square meters
Total Employees
5 - 10 People